By continuing to browse the site you are agreeing to our use of cookies. For more details about cookies and how to manage them, see our cookie policy.
|
|
6m |
6m |
|
Q2 2022 |
Q1 2022 |
Q2 2021 |
Copper production1 |
kt |
179.9 |
150.3 |
|
90.0 |
89.9 |
77.9 |
Aktogay |
kt |
104.2 |
69.9 |
|
53.5 |
50.7 |
36.0 |
Bozshakol |
kt |
51.6 |
53.9 |
|
24.9 |
26.7 |
27.6 |
East Region & Bozymchak |
kt |
24.1 |
26.5 |
|
11.6 |
12.5 |
14.3 |
Gold production2 |
koz |
84.5 |
82.9 |
|
41.8 |
42.7 |
43.0 |
Silver production2 |
koz |
1,732 |
1,664 |
|
844 |
888 |
901 |
Zinc in concentrate |
kt |
19.2 |
21.8 |
|
8.5 |
10.7 |
12.2 |
Copper sales3 |
kt |
187.5 |
137.0 |
|
96.7 |
90.8 |
69.2 |
Gold sales4 |
koz |
99.5 |
62.5 |
|
49.1 |
50.4 |
30.0 |
Silver sales4 |
koz |
1,992 |
1,411 |
|
990 |
1,002 |
770 |
Zinc in concentrate sales |
kt |
24.1 |
22.1 |
|
9.1 |
15.0 |
13.8 |
1. Payable metal in concentrate and copper cathode from Aktogay oxide ore
2. Payable metal in concentrate
3. Payable metal in concentrate, toll processed metal and copper cathode from Aktogay oxide ore
4. Payable metal in concentrate and toll processed metal
Highlights
Andrew Southam, Chief Executive Officer, said: “KAZ Minerals achieved a 20% increase in copper output in the first half of the year, with the ramp-up of the second sulphide concentrator at Aktogay continuing to surpass expectations. The Group has maintained its focus on optimising operational performance enabling the first concentrator at Aktogay and both Bozshakol plants to raise ore throughput levels further above their design capacity.”
For further information please contact:
KAZ Minerals |
|
|
Susanna Freeman Maksut Zhapabayev |
Company Secretary, London Corporate Communications, Almaty |
Tel: +44 20 7901 7826 Tel: +7 727 244 03 53 |
REGISTERED OFFICE
7th Floor, 83 Victoria Street, London SW1H 0HW, United Kingdom.
PLEASE FOLLOW THE LINK TO DOWNLOAD THE FULL ANNOUNCEMENT