KAZ MINERALS GROUP Production Report for the first quarter Ended 31 march 2021
- Highlights
- Group copper production1 of 72.4 kt (Q4 2020: 75.7 kt), on track to achieve annual guidance of 275-295 kt
- Gold production2 of 39.9 koz (Q4 2020: 35.9 koz) as Bozymchak contributed for the full quarter following the restart of operations in December 2020
- Net debt of $2,410 million (31 December 2020: $2,601 million) with $62 million of undrawn facilities and gross liquid funds of $1,298 million (31 December 2020: $1,299 million)
- Covid-19 update
- Ensuring the safety, health and wellbeing of employees and contractors remains the Group’s priority
- Comprehensive measures, including testing and isolation, remain in place to protect staff and mitigate the risk of disruption to operations
- These measures ensured that there was no major impact to the Group’s operations in Q1 resulting from Covid-19, other than minor delays to shipments across the Kazakhstan-China border
- Aktogay
- Q1 copper production1 rose to 33.9 kt (Q4 2020: 31.9 kt) due to increased ore throughput and a higher average recovery rate
- Copper cathode production from oxide ore decreased to 3.3 kt (Q4 2020: 4.6 kt) due to lower ambient temperatures and maintenance
- Bozshakol
- Copper production2 reduced to 26.3 kt (Q4 2020: 31.3 kt) due to a lower ore throughput as a result of maintenance at the concentrators combined with lower average grades and recovery rate
- Gold production2 of 26.2 koz (Q4 2020: 31.4 koz) impacted by reduced ore processed volumes and lower average
grades and recovery rate
- East Region and Bozymchak
- Copper production2 of 12.2 kt (Q4 2020: 12.5 kt) as lower grade material was processed
- Gold production2 of 13.7 koz (Q4 2020: 4.5 koz) following the restart of operations at the Bozymchak mine
- Silver production of 431 koz (Q4 2020: 362 koz) and zinc in concentrate output of 9.6 kt (Q4 2020: 10.2 kt)
|
Group production summary3 |
|
Q1 2021 |
Q4 2020 |
Q1 2020 |
|
Copper production1 |
kt |
72.4 |
75.7 |
74.9 |
|
Aktogay |
kt |
33.9 |
31.9 |
33.3 |
|
Bozshakol |
kt |
26.3 |
31.3 |
29.8 |
|
East Region & Bozymchak |
kt |
12.2 |
12.5 |
11.8 |
|
Gold production2 |
koz |
39.9 |
35.9 |
55.4 |
|
Silver production2 |
koz |
763 |
732 |
793 |
|
Zinc in concentrate |
kt |
9.6 |
10.2 |
9.0 |
1 Payable metal in concentrate and copper cathode from Aktogay oxide ore.
2 Payable metal in concentrate.
3 See appendix for metal production by asset.
Andrew Southam, Chief Executive Officer, said: “The Group has delivered another strong quarter, with copper production of 72 kt, and is on track to achieve the full year guidance for all metals.”
For further information please contact:
|
KAZ Minerals PLC |
|
|
|
Ed Jack |
Investor Relations, London |
Tel: +44 20 7901 7882 |
|
Anna Mallere |
Investor Relations, London |
Tel: +44 20 7901 7814 |
|
Maksut Zhapabayev |
Corporate Communications, Almaty |
Tel: +7 727 244 03 53 |
|
Brunswick Group |
|
|
|
Carole Cable, Charlie Pretzlik |
|
Tel: +44 20 7404 5959 |
REGISTERED OFFICE
6th Floor, Cardinal Place, 100 Victoria Street, London SW1E 5JL, United Kingdom.
PLEASE FOLLOW THE LINK TO DOWNLOAD THE FULL ANNOUNCEMENT