Our business

Production summary

Our production at a glance

 

2014

2015

2016

2017

2018 guidance

Copper (kt)

84

81

144

259

270-300

Zinc (kt)

121

94

75

58

c. 60

Gold (koz)

35 35 128 179 160-175

Silver (koz)

3,435

3,135

3,284

3,506

c. 3,000

2014 production for continuing operations only.

Production reported for the period 2014-2015 is copper cathode equivalent, gold bar equivalent, silver bar equivalent and zinc in concentrate.

Copper, gold and silver production reported for 2016 onwards is payable metal in concentrate and copper cathode from Aktogay oxide ore. Zinc production is zinc in concentrate.

DOWNLOAD ANALYSTS PACK