Refurbished vents in the turbine hall at the Ekibastuz Power Station

Results & Reports

RELEASE DATE (GMT) RESULT VIEW DOWNLOAD
29/10/2015 Q3 Production Report 2015 and IMS PDF (354 KB)
16/09/2015 Deutsche Bank Access Metals and Mining Conference PDF (1.77 MB)
20/08/2015 Half-Yearly Results 2015 PDF (328 KB)
20/08/2015 Half-Yearly Results 2015 presentation PDF (3.14 MB)
30/07/2015 Q2 Production Report 2015 PDF (476 KB)
01/06/2015 Bozshakol Site Visit presentation PDF (2.61 MB)
12/05/2015 BofA Merrill Lynch Global Metals, Mining & Steel Conference 2015 presentation (extended) PDF (8.05 MB)
12/05/2015 BofA Merrill Lynch Global Metals, Mining & Steel Conference 2015 presentation (short version) PDF (6.49 MB)
06/05/2015 Roadshow presentation May 2015 PDF (4.50 MB)
30/04/2015 Q1 Production Report 2015 and IMS PDF (177 KB)
02/04/2015 Annual Report and Accounts 2014 PDF (4.31 MB)
02/04/2015 Notice of General Meeting 2015 PDF (106 KB)
26/02/2015 Preliminary Results 2014 PDF (1.24 MB)
26/02/2015 Preliminary Results 2014 Presentation PDF (2.49 MB)
29/01/2015 Q4 Production Report 2014 PDF (218 KB)
SUPPORTING INFORMATION