KAZ Minerals

HIGH GROWTH – LARGE SCALE – LOW COST – FOCUSED ON COPPER

Refurbished vents in the turbine hall at the Ekibastuz Power Station

Results & Reports

RELEASE DATE (GMT) RESULT VIEW DOWNLOAD
31/12/2006 Annual Report 2006 PDF (2.37 MB)
31/12/2006 Preliminary Results 2006 PDF (287 KB)
31/12/2006 Q4 Production Report 2006 PDF (108 KB)
30/09/2006 Q3 Production Report 2006 PDF (147 KB)
30/06/2006 Interim Report 2006 PDF (904 KB)
30/06/2006 Interim Results 2006 PDF (262 KB)
30/06/2006 Q2 Production Report 2006 PDF (49.4 KB)
31/03/2006 Q1 Production Report 2006 PDF (182 KB)
SUPPORTING INFORMATION